Hi Francis,
I have read your queries. We are a company called Renewable Energy Engineering Contractors (REECON). Currently constructing at least 5 Plants in a month (fixed dome design of different sizes). We are based in Ngong Town 30 km from Nair...
Hi Francis.
My names are Kinoti Samwel and I am a Biogas contractor In Kenya.What determines the pressure a biogas plant achieves is the design of the biogas plant you intend to install.
Two main common designs in our country are the floating drum...
Hi to all,
I'm wondering if the digester can be located at about 70metres, can it affect the gas flow?if so, what can be done to have the gas reach beyond 70metres?